Upper Drop Structure Construction
http://www.acewater.com/wp-content/uploads/2016/01/Lower-Drop-Structure-Construction.jpg -
Channel construction, May 2014
http://www.acewater.com/wp-content/uploads/2016/01/Channel-Construction-May-2014.jpg -
Channel recovery, September 2014
http://www.acewater.com/wp-content/uploads/2016/01/Channel_September-2014.jpg -
Channel recovery, October 2014
http://www.acewater.com/wp-content/uploads/2016/01/Channel-October-2014.jpg -
Geoweb installation to stabilize a road crossing the channel
http://www.acewater.com/wp-content/uploads/2016/01/Geoweb-installation.jpg -
Pedestrian bridge installation
http://www.acewater.com/wp-content/uploads/2016/01/Pedestrian-Bridge-installation-2.jpg -
Pedestrian bridge installation
http://www.acewater.com/wp-content/uploads/2016/01/Pedestrian-Bridge-installation-3.jpg -
Outfall structure construction at confluence with Cache La Poudre River
http://www.acewater.com/wp-content/uploads/2016/01/Outfall-Construction.jpg -
Outfall structure after 1 growing season
http://www.acewater.com/wp-content/uploads/2016/01/October-2015.jpg -
Arthur Ditch siphon construction
http://www.acewater.com/wp-content/uploads/2016/01/Siphon-Construction.jpg -
Arthur Ditch siphon complete
http://www.acewater.com/wp-content/uploads/2016/01/Siphon-Complete.jpg